Photo of Peak Tram

Photo: LN9267, CC BY-SA 4.0, Wikimedia Commons

Central · Stop 4 of 4

Peak Tram

山頂纜車

  • Time here: 45 min to 1 h 30 min
  • Hill railway
  • Ticket needed
  • Long queues
Directions

When you are there

  • On the way up: two strong curves, and the slope changes a lot
  • Look out for wide views over the harbour and the skyscrapers
  • At the top station: the Peak Tower

Peak Tram.

The Peak Tram is a funicular railway that climbs from Central up to Victoria Peak. It has run since 1888, and it was the first funicular railway in Asia.

The lower station is on Garden Road, near St John's Cathedral. It is built into the ground floor of an office tower, St John's Building, with one platform for getting on and one for getting off. From there, the line climbs about 1.4 kilometres and rises almost 400 metres. On the way it makes two strong curves, and the slope changes a lot.

On the way up, you get wide views over the harbour and the skyscrapers. The Peak Tram is still the most direct way to the top, and both visitors and local people use it.

The tram is run by the company that also owns the Peninsula Hotel. At the top station stands the Peak Tower, a leisure centre.

After a long renovation, the Peak Tram reopened on 27 August 2022.

Quick facts

  • 1888Running
  • The first funicular railway in Asia
  • Climbs almost 400 metres

Visit tips

There is a ticket for the ride, and queues can be long. Check prices and opening hours before you go. Allow one to one and a half hours for the ride and the views at the top.

Last stop of the walkBack to the Central walk